Metavante Corporation (now FIS Global) Data Center
This project was programmed and designed in two phases with a final square footage of nearly 250,000 square feet. The building contains the entire data and information system equipment and network links for Marshall and Ilsley’s Banking Operation.
As the Data Services Division of Metavante have grown, so to have Zimmerman’s responsibilities to this client. Various departments, personnel and components of this operation have grown, consolidated or divided over the last few years. At the owner’s request, Zimmerman reprogrammed and provided space planning for the building twice to allow for changes in technology, operation and service.
Location: Brown Deer, Wisconsin
Size: 250,000+ s.f.
Services Provided: Architectural Planning and Design, Structural Engineering, Interior Design, Landscape Architecture
Completion Date(s): 1997