Pewaukee Fire Station
Zimmerman was retained again by the City of Pewaukee to design a replacement station on the grounds of the WCTC campus in the Village of Pewaukee. Given its proximity to County Highway SS, its location across multiple jurisdictions and the need to incorporate the requirements of this growing community into the collaboration existing between the technical college and the City, the design was challenging. The 12,000 square foot project was completed in summer 2008 and was bid on time and on budget.
Location: Pewaukee, Wisconsin
Size: 12,000 s.f.
Services Provided: Architectural Planning and Design, Structural, Mechanical, Electrical, and Plumbing Engineering, Interior Design, Landscape Architecture
Completion Date(s): 2008
Contractor/Construction Manager: Absolute Construction